Client:
HGS Leicester Ltd
Sector:
Commercial
Location:
Croft Hill Service Station, Coventry Road, Leicester
Our Services:
Transport Planning & Water Management
Images:
InkDrawn Architecture
The EA Flood Map for Planning indicated the site was within fluvial Flood Zone 2 and 3. Working with the Design Team we provided advice in relation to flood risk matters such as flood resilient construction methods and an attenuation SuDS scheme to ensure that the development proposals did not increase flood risk over the lifetime of the development. The SuDS strategy provided significant betterment in terms of offsite surface water discharge rates for the development proposals compared to the existing situation.
Doug Hickman
Director
Jess Pockett
Associate Director (Flood Risk & Drainage)