Sector:
Residential & Commercial
Location:
Cumnor Road, Oxfordshire
Our Services:
Water Management & Transport Planning
Images:
Thinking Buildings
A foul water drainage network was designed to discharge foul flows from the site to the existing 150mm diameter public foul water sewer, via a new connection at the existing manhole. CE liaised with TWU who advised they would have no objection to the proposed foul drainage connection point and discharge rate.
The layout was developed in consultation with our Transport team who undertook swept path analysis (vehicle tracking), with changes being recommended to ensure compliance with standards. Further tracking was also provided to confirm compliance with Building Regulations with respect to fire access during the consultation period.
Jess Pockett
Associate Director (Flood Risk & Drainage)
Ben East
Associate Director (Transport Planning)