Client:
Sector:
Residential
Location:
Warfield, Bracknell
Our Services:
Infrastructure Design
Other work associated with the surface water management of the site included designs for temporary works silt and water flow interception and improvements to existing ditches along the site boundaries to restore flow capacities.
We also carried out the detailed design of the onsite roads for S38 adoption purposes, as well as the design of the S278 works relating to the site access junction.
Rob Bowley
Director